1. Calculation of HVAC heat load calculations using HAP 4.5 software.
2. Selection of HVAC equipment.
3. Calculation of required pump head of secondary and primary chilled water pumps.
4. Duct sizing & air outlet selection.
5. Preparation of HVAC shop drawing with suitable duct and pipe routing in coordination with other MEP services above ceiling.
6. Preparation of BMS drawings as per equipment sequence of operation and MEP practice of interfacing between HVAC equipments, plumbing equipments and firefighting and fire alarm systems.
7. Chilled water pipe sizing & shop drawing preparation in coordination with other MEP services.
8. Solutions for low power consumption air conditioning system.
9. Solutions for low ground water crisis such as Rain water harvesting system and Existing Bore recharge with rain water injection system.
10. Solutions for waste (Grey) water treatment plant to utilize for flush water in Toilets.
11. Cold and hot Water supply pipe sizing and shop drawing preparation.
12. Booster water Pump Head Calculation.
13. Drainage, waste and vent pipe sizing, storm (Rain) water pipe sizing and shop drawing preparation.
14. Fire water and sprinkler pipe sizingand shop drawing preparation for different kinds of hazards such as light, ordinary and extra hazard classifications.
15. Quantity survey after concept design drawing approval. Material Take off to be done for all the items in the drawing followed by BOQ preparation.
16. Pricing analysis and project cost estimation services.
1. Procurement and study of materials required for the project as per project specifications and drawings.
2. Prepare the material submittal for Client approval upon finalization of vendor.
3. Supervision and execution of all the Commercial and residential building services such as
A. Exhaust, supply and return air ducting and Chilled Water piping
B. Installation of all types of HVAC equipment such as Chillers, AHU, Package and split AC units, Roof/Wall mounted Exhaust Fans, Parking Exhaust fans, stair pressurization fans and smoke extract fans.
C. Cold and hot water Piping, Drainage, waste and vent piping, storm (Rain) water drainage and harvesting system.
D. Installation of all types of Plumbing fixtures and Electric water heaters.
E. Fire water and sprinkler Piping, Installation of Fire Hose Cabinets, staircase landing Valve, Fire department Valves and external fire hydrants.
F. Installation of Booster water pumps, submersible pumps, secondary and primary chilled water pumps, Electric fire and jockey pumps and Diesel fire pumps.
G. Installation of Booster water pumps, submersible pumps, secondary and primary chilled water pumps, Electric fire and jockey pumps and Diesel fire pumps.
H. Solar power plant , solar water heater and solar pumps installation