Our Project

Project: 90m high Eastern Water Tower Project @ Al Khobar, Saudi Arabia.

90m high Eastern Water Tower Project @ Al Khobar standing on an artificial island, 500 metres away sea shore on khobar cornice. There is a Ground floor, maintenance floor, Restaurant floor and View deck floor with 4 no’s of Air Cooled chillers of 200ton each. .

All the floors are Fire protected with wet sprinkler system with fire water pumped from fire pumps installed in maintenance floor.

Project : Crowned plaza hotel Dubai festival city Dubai.

A 20 stories five star hotel project In Dubai festival city 4 level podium facility containing car parking loading docks stall facilities hotel servicing facilities retail areas and swimming pools and other water features. .

Project : Dr Sulaiman al Habib medical centre @Al rayan Khurais road Riyadh

Al rayan Khurais road riyadh ksa A 250 bed multi speciality hospital having 6 floors including a basement and total area is 80000 sq meters .Chilled water plant of 2000 tons capacity. .

Project : Student Housing in KFUPM Phases I, III & IV @DHAHRAN, Saudi Arabia .

The Student Housing Project included housing three stories buildings, Mosques etc & the External works, Cable television, Water supply, Fire Fighting, Storm drainage, Sanitary Sewerage system, MV &LV distribution, Fire Alarm &Telephone Network Systems..

Scope of Work.

• Hostel Buildings:47
• ToCommunity Buildings:6
• Mosques:4
• Total Chillers Capacity:10,000 Tons

Project : College of Medicine

•Owner: Ministry of Higher Education – Taif University , KSA.
• Consultant: Zuhair Fayez Partnership Consultants Architecture Engineering and Information System.
• Duration: 30 Month
• Completion Date: April 2017
• Location: Taif University – Saudi Arabia.

Project : Construction of Student Housing

•Owner: Ministry of Higher Education – Taif University, KSA.
• Consultant: Zuhair Fayez Partnership.
• Location: Taif University – Saudi Arabia
• Built Up Area: 76,000 M2

Project : General Auditing Bureau Head Quarters – North Lot Project

• Owner: General Auditing Bureau – Saudi Arabia
• Consultant: Otaishan Consulting Engineers
• Duration: 36 Month
• Completion Date: March 2017

Project : Student Lobby in Male Academic Area

• Owner: Ministry of Higher Education – Imam University
• Consultant: TYPSA (Tecnica Y Proyectos S.A – Madrid – Spain)
• Duration: 36 Month
• Completion Date: April 2018
• Location: Imam University – Riyadh – Saudi Arabia
• Built Up Area: 25,000 M2

Project : Rehabilitation of Male Students Academic Area

• Owner: Ministry of Higher Education – Imam MuhammedIbn Saud Islamic University.
• Consultant: TYPSA (Tecnica Y Projectos S.A – Madrid – Spain)
• Duration: 24 Month
• Completion Date: June 2017
• Location: Imam University – Riyadh – Saudi Arabia

Project : SEC Head Quarters project @ Riyadh ,KSA

Consultant ::Omrania& Associates

- Complete Air-conditioning System with capacity 6,000 TR.
- Complete Plumbing Works.
- Complete Fire Fighting Works (NOVEC + Sprinklers System).